- 相關(guān)推薦
艦船維修系統(tǒng)建模與能力評估
The authors developed a prototype of a warship maintenance system. The process started by defining the maintenance requirements of warship equipment. Next, a planning scheme was development for a maintenance network. An optimization target for the plan and indexes for assessment were established. Based on the above work, a simulation model was proposed with two layers: a base and a workshop. Dispatching rules were then formulated for the simulation. Experimental results proved the validity of the model and the dispatching algorithm. It was found that the model can solve the capacity evaluation problem for maintenance systems and provides a scientific basis for decision-maker to make decisions regarding equipment maintenance.
作 者: 趙金超 齊歡 張勇明 Jin-chao Zhao Huan Qi Yong-ming Zhang 作者單位: 刊 名: 船舶與海洋工程學(xué)報(英文版) 英文刊名: JOURNAL OF MARINE SCIENCE AND APPLICATION 年,卷(期): 2010 9(1) 分類號: U6 關(guān)鍵詞: capability assessment planning optimization heuristic regulation warship maintenance system【艦船維修系統(tǒng)建模與能力評估】相關(guān)文章:
系統(tǒng)工程的建模問題04-26
基于物元分析的彈炮結(jié)合系統(tǒng)探測跟蹤能力評估04-26
艦船裝備技術(shù)保障資源效能評估指標體系研究04-27
生態(tài)產(chǎn)業(yè)系統(tǒng)的構(gòu)建模式分析04-27
電推進系統(tǒng)壓力調(diào)節(jié)單元的建模和分析04-27
產(chǎn)品設(shè)計過程建模與執(zhí)行系統(tǒng)研究04-27
能源系統(tǒng)復(fù)雜性管理建模方法研究04-27
工作能力及自我評估范文04-26